Case Studies
"IT CAN'T BE DONE."
We have heard that before.
All case studies are published with customer consent and within NDA boundaries. Platform, team, and programme names are withheld where requested.
F1 Aerodynamics
They said 72 hours was impossible. We delivered in 58.
An F1 team's front wing assembly was damaged in transit ahead of a flyaway race. Tooling was locked in Europe. No local option existed.